Raw Material Preparation, Sintering and Hot Metal / Scrap Charging
Coordinates weighing and pouring of torpedo-car hot metal from the blast furnace in integrated plants, or layered magnetic crane loading of graded scrap into charging buckets in electric arc furnace plants.
Operator Screens (POD)
- Scrap Bucket Preparation and Layered Charge Consumption Screen
- Torpedo Car Weighing and Pouring Operator Screen
- Sinter Production and Raw Material Weighbridge Consumption Screen
Shift Supervisor & Control
- Order Sequencing and Heat Scheduling Cockpit
- Raw Material Inventory and Charge Queue Monitor
Quality & Laboratory
- Incoming Raw Material and Sinter Chemical Analysis Screen
3D Digital Twin & Warehouse
- 3D Scrap Yard and Bucket Charging Digital Twin (Overhead magnet crane, scrap bays and live charging bucket telemetry)