
Iron & Steel Integrated Plant 3D Digital Twin
Full-cycle 3D simulation from scrap bays, EAF, Ladle Furnace (LF), Vacuum Degassing (VD), and 4-strand CCM to 112/118-billet reheating furnaces, Bar Rolling Mill (PK-...), and Wire Rod Coil Mill (KG-...).
- 108-min ladle cycle (L-01..L-03) and 4-strand CCM (44 billets/heat)
- Transparent Inside-Furnace mode (112 and 118 billet FIFO thermal grid)
- 3 simultaneous active billets per rolling mill and Heat Trace genealogy


